Institutional / Envelope & glazing · 2022
Riverside Pavilion
A failing institutional envelope replaced and a new glazed atrium inserted, on a building that never closed.

The brief
Spalling brick, fogged sealed units and a dark central circulation core. The client wanted a warm, daylit arrival and an envelope that would last another forty years.
The challenge
- The building operated seven days a week throughout.
- Overhead protection required at every public entrance for the full envelope programme.
- Glass units up to 4.2 m had to be craned over an active pedestrian route.
What we did
Brickwork was cut out and rebuilt in bays with new stainless ties and a continuous air barrier behind. The new atrium was framed and glazed under a protected deck, with every oversized lift booked into a Sunday morning possession and a marshalled exclusion zone.



Before & after
Riverside Pavilion, start to finish.
Drag the handle, or use the arrow keys.

Client
“Thirteen months of envelope work and we never turned a single visitor away at the door.”
Facilities Director, Institutional client, Toronto
Credits
Envelope: RJC · Photography: APA in-house
Next project
Atlantic Yards
(08) Start here
Tell us what
you want built.
Call directly
(416) 289-0001Office
250 Consumers Road
North York, ON M2J 4V6





